Rate Schedule |
Rate Effective |
GS-1 (Residential and Farm) |
|
GS-2 (Residential and Farm Inclining Block) |
|
GS-3 (Residential and Farm Time-of-Day Rate) |
|
SC-1 General Service (0-100 kW) |
|
SC-2 (General Service 0-100 kW Time-of-Day Rate) |
|
LP-1 Large Power (101 kW to 500 kW) |
|
LP-1 Large Power (101 kW to 500 kW Time-of-Day Rate) |
|
LP-2 Large Power (Over 500 kW) |
|
Large Industrial Rate - Schedule B-1 |
|
Large Industrial Rate - Schedule B-2 |
|
Large Industrial Rate - Schedule G1 |
|
Interruptible Service Rider |
|
Outdoor Lights Open Bottom Light - Approx. 6,000-9,500 Lumens Open Bottom Light - Approx. 25,000 Lumens Direction Flood Light - Approx. 50,000 Lumens Shoebox Fixture (metal pole) - Approx. 6,000-9,500 Lumens Acorn Fixture (fiberglass pole) - Approx. 6,000-9,500 Lumens Colonial Fixture - Approx. 6,000-9,500 Lumens Cobra Head (aluminum pole) - Approx. 50,000 Lumens Ornamental Light-Approx. 6,000-9,500 Lumens Ornamental Light-Approx. 25,000 Lumens Colonial Fixture (15 ft. mounting height) - Approx. 6,000-9,500 Lumens Cobra Head (aluminum pole) - Approx. 25,000 Lumens Cobra Head (aluminum pole) - Approx. 6,000-9,500 Lumens |
$12.23 $19.02 $19.45 $21.35 $20.60 $17.45 $26.55 $12.07 $17.27 $10.61 $18.83 $12.72 |
The nominal primary voltage for Blue Grass Energy are 7.2/12.47 kV and 14.4/25 kV.
The nominal secondary voltage for Blue Grass Energy are:
120/240 v single-phase 120/240 v three phase (overhead only)
120/208 v three phase 277/480 v three phase
240/480 v three phase
Note: Facility Charge (also referred to as Customer Charge) is the cost of fixed charges that include wires, poles, meter, transformers, substations and maintenance. These costs occur monthly and have no relationship to the amount of kilowatt-hours used.